Town of Fort Erie Pool By-Law No. 149-08
Section 2.3 specifically states: No person shall place water or allow water to remain in any Pool unless a required Pool Permit has been issued and the Pool Enclosure has been inspected and approved by an Officer and constructed and maintained in compliance with this By-law.
Prior to submission of a Building Permit application, please consult with the Building Department @ 905-871-1600 Ext. 5510.
Do I need a Pool Permit? |
Yes. According to the Town's Pool By-law No. 149-08, all types of swimming pools, including private spas (hot tubs, whirlpools and jacuzzis) which contain water having a depth 0.6 metres (24”) at any point, requires a pool permit. Unless a private spa is being dismantled and reconstructed within the same location a pool permit is not required. |
Rules and Regulations |
|
Emptying of Pools |
|
Do I need a gate and a fence enclosure around the pool? |
Yes. Gates and a fencing is required to create an enclosure to prevent unwanted access to pools.
|
What is required for a Building (Pool) Permit submission? |
The Town will require the following information to be be clearly illustrated & identified on a site/plot plan & is required to be submitted with the permit application.
Please refer to the sample drawing & ensure that the drawings proposed for submission match or exceed the level of detail. Please note that the sample drawing is strictly intended to be used as an example only. |
What are the rules and regulations for decks and patios? |
|
Required 2024 Permit Fees |
Note: The Municipal Protection Deposit is required to ensure that the municipal road allowances, boulevards, curbs, sidewalks, culverts etc., are kept clean & not damaged during construction & installation. The Lot Grading Deposit is required to ensure that the proposed grade elevations fully comply with the grade elevations proposed. Once the project has passed the final inspection & final lot grading, the municipal deposits are returned. The information provided is intended to assist & guide the Building Permit process. Regulations & fees are subject to change, therefore, please contact and consult the Building Department Staff. |
How do I obtain a Pool Permit application? |
At Town Hall, 1 Municipal Centre Drive, Building Department - Second Floor |
For further information with the In-ground Permit process, please review the following video.